6 Keys for Housing Building Plans

Posted on

Proper planning is essential for your home and determining the appearance, quality and implementation. The project accompanies the construction of the house from start to finish. The housing building plans must consider the following points:

  • Rent, buy or build
  • The planning
  • The project
  • The assignments of construction work
  • The responsibility of the designer
  • The timetable

Rent, buy or build

It is the individual circumstances to determine whether it makes more sense to rent, buy or build. Thus, the choice of renting a house can depend on professional reasons or other; normally buy costs more to build, but this saves time-consuming and causes less problems and concerns. Usually you buy the finished product, which has a purchase fixed price and is not cause for concern and problems with artisans or businesses. However, if you decide to build, first of all you need it is good planning.

The planning

Building a house without a designer is impossible. What we suggest is devoted to the search as long as necessary, because good communication and a good feeling between the developer and the designer are essential. Between the two it is in fact to create a delicate relationship of exchange. First of all you must be clear about what you want and you discussed it with your family. The designer must understand your ideas and your wishes and help you achieve them, because what will be built will be the house you wanted you. The designer can extend its cooperation beyond the initial planning phase, taking shape as construction manager.

READ  Barn Shed Plans To Build A Shed Easily

Clients in rural areas tend to turn to the surveyor, so choosing the cheapest way. The patrons of cities and neighboring municipalities to them, as well as the clients that rely on particular architecture, choosing instead to contact the architect.

The project

A good design must contemplate all aspects of the construction, solar lighting, architecture, building materials, building installations, the structuring of interiors and outdoor areas. The project serves to inform everyone of what will be built, by the buyer to the municipality up to artisans. Before approving a final project, consult extensively with homeowners to your liking.

The assignment of construction work

Once completed and approved the project, you need to look for the artisans. You can instruct a building enterprise “turnkey”, so to speak, or you can try your own individual artisans and coordinate them. Both systems have advantages and disadvantages. Turnkey assignment is preferred by customers extremely busy from the professional point of view, they have little time to devote to the supervision of construction work. In addition, that in this case the customer has to do with a single point of contact. In case of defects the contractor is responsible for the entire building. Separate assignment of works assumes that the customer has time to spare and be a good organizer as well considered constructions and know how to express that.

READ  Tricks to Clean Windows

In the assignments of construction can also choose a middle ground. For example, the Mason can deal with in addition to the excavation and construction materials also plastering. The same goes for the roof: in addition to the work of the roof covering the Carpenter can also perform the work of tinsmith. The Carpenter building, in turn, can deal with not only interior doors, but also of the front door, and window greenhouse.

The responsibility of the designer

The designer has a criminal, civil and administrative liability. He is also responsible for damages not foreseeable, but the customer is obligated to prove intent of harm. In the event of minor negligence is not liable if the designer has to solve complex problems.

The timetable

A big problem that emerges with the artisans is respect for deadlines. How do you manage your building? What is best: build fast or slow? Unfortunately, there are no universal recipes, but in general the following applies: If the customer has a lot of time, can participate in the organization of the construction site. There’s also makes one wonder: how long is the building? If necessary, the buyer has the ability can also build personally their home with the help of some helper. However, doing so will save very little compared to the total cost of labor. If you’re in a hurry, prefabricated parts as the walls of the cellar, the brick walls, stairs and prefabricated ceilings can accelerate considerably the construction and within a few months the building may be habitable. The walls and ceilings in cast concrete and plastered produce a considerable moisture, drying only with the passage of time. If the stipulated time for drying of construction components is not indicated, this can be a source of irritation.

READ  Home Decoration Tips: Using Simple and Cheap Materials to Decorate Your House